Pleased to report some positive progress with Transport Scotland on the contractual arrangements and VAT implications of the project. The concrete breakwater pontoons are progressing well; one unit has been completed (pictured) and the other two have been fabricated. The three 85-tonne pontoons will be joined together and towed to Ullapool from Ireland in the coming months and installed on arrival. The breakwaters will provide much needed shelter for the inner harbour pontoons by reducing the wave climate.