Category: May 2014

May 2014

The main pier extension ‘caisson’ has been built in Inchgreen dry-dock on the River Clyde. This unorthodox construction method was chosen to reduce/eliminate any potential negative impact on the routine ferry service running throughout the project. The 4000 tonne concrete and steel structure designed by Wallace Stone Marine Consulting Engineers was built in a period […]

Read More